BRAKE
POWER CERTFICATE:-
BPC is issued after intensive examination of train in empty
condition.
·
No sick wagon is allowed to run.
·
Prepare in triplicate.
·
Indicates brake power percentage of
the train.
·
BPC will be invalid if,
(a)
The destination of the train is not mentioned on BPC.
(b)
The train composition of train is changed by 10 four wheeler unit or more.
(d)
The integrity is changed of CC rake more than four, 8 wheeled wagon.
AIR PRESSURE
CONTINUITY TEST:-
OBJECTIVE:-
1-Continuity of brake pipe pressure from engine to brake van/ last vehicle.
2-On
reduction of brake pipe pressure by driver, train brake must apply.
3-In
emergency condition, if guard destroys BP pressure, then also train brake
should be applied.
WHERE
TO PERFORM:-
1- When an engine is attached ahead or behind the train
engine.
2- When an engine is attached behind the last vehicle of
the train.
3- When traction or engine is changed.
4- When shunting is performed in a train.
5- Whenever air pressure leakage/brake power work is
attended on a train.
6- When a stable load has to be cleared from a road side
station.
PROCEDURE:-
1.
Charge the train with air pressure and ensure the requisite amount
In
Engine
In Brake Van
BP-
5.0
4.8 Kg/cm211- Maintenance is less.
FP-
6.0
5.8 Kg/cm2
2.
Guard will destroy the BP pressure by 1 Kg/cm2 with the help emergency handle
of brake van or angle cock of last vehicle.
3.
Driver will ensure that BP pressure drops in engine also. He will observe Air
flow indicator, light and buzzer.
4.
Guard will place the emergency handle in normal position and will
allow the BP pressure to charge again.
5.
Driver and Guard will ensure that requisite amount of BP
pressure is
charged again in engine as well as in brake van.
6.
Driver will destroy the BP pressure to zero with the help of driver’s brake
valve.
7.
Guard will ensure the Bp pressure in brake van /last vehicle has
also dropped to zero.
8.
To ensure brake application on train, Assistant Driver and Guard will check
3 or 4 wagons/ vehicles from their respective ends.
9.
Driver will charge again Bp pressure by keeping the Driver’s brake valve in
release position.
10.
Driver and Guard will ensure that BP pressure both in engine and brake van /
last vehicle is charged again to prescribed amount slowly and at Uniform
rate.
|
- Rail News
- Rly Circulars /Orders
- Promotion / Transfer
- Departmental Exam
- Divisions - Order & News
- Employee News
- Always Important
- Station Master
- G & SR
- Accident Manual
- Operation Manual
- Railway Joke
- Rly Facility
- Interesting Fact
- World Rly
- Education, Job & Career
- Seniority List Retirement Benefit
- Know About Railway
- Rules & Rule Book
- Rly Mannuals & Codes
- Useful Calculator
- Forms- Rly Employee
- YouTube Video - Rly
- Rly Telephone Directory
- Railway Plus
- Rly Question Papers & Bank
- Result
- Rly Study Material
- Operating Dept Guide.
- Establishment Rules
- Financial Rules
- C & W - Guide
- Loco Pilot Guide
- P Way- Guide
- Commercial Dept. Guide
- Rail Management Guide
- Rly Store Guide
- राजभाषा -हिंदी
- First Aid Guide
- Horoscope
- Also Read
SEARCH
9/28/2024
C & W - SILENT FEATURE OF BRAKE POWER CERTIFICATE (BPC)
.
Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.