Knowledge Hub Search – Search All Our Sites

Employee Information Smart Search


Sort :
Loading...
Go to Page :
Showing posts with label SILENT FEATURE. Show all posts
Showing posts with label SILENT FEATURE. Show all posts

9/28/2024

C & W - SILENT FEATURE OF EMERGENCY BRAKING DISTANCE



 
EMERGENCY BRAKING DISTANCE
(RAILWAY BOARD’S LETTER NO. 2001/M (L)/466/63 DATED 11-02-2004)
The emergency braking distances for following train combinations with air and vacuum brake and wagons hauled by diesel locomotive at different speeds and on level sections have been estimated values are as under.

 EBD of coaching stock hauled by single locomotives:-

No. of Coaches
     EBD in meter at varying speed KMPH
 50
 60
 70
 80
90
 100
 110
16 Air Brake coaches
180
260
358
487
642
815
1019
18 Air Brake coaches
183
263
362
489
645
819
1024
20 Air Brake coaches
189
271
363
497
655
829
1043
16 Vacuum Brake coaches
240
332
452
590
761
971
1196
18 Vacuum Brake coaches
243
344
457
604
784
980
1216
20 Vacuum Brake Coaches
252
357
471
619
801
1004
1227



At 110 KMPH, WDM2 to be used in double headed or MU consist.

EBD of coaching stock hauled by single WDM2c/ WdP2 locomotive.
         No. of Coaches
  EBD in meters at varying speed  KMPH
50
60
70
80
90
100
110
16 Air Brake coaches
180
260
358
487
642
815
1019
18 Air Brake coaches
183
263
362
489
645
819
1023
20 Air brake coaches
189
271
363
497
655
829
1043
16 Vacuum Brake coaches
240
332
452
590
761
971
1196
18 Vacuum coaches
243
344
457
604
784
980
1216
20 Vacuum Brake coaches
252
357
471
619
801
1004
1227
For 22 and more coaches used multiple loco.

EBD of freight stock hauled by single WDM2 Locomotive.

 No. of wagons
  EBD in meters at varying speed KMPH
  50
60
70
75
58 BOXN wagons loaded
470
669
897
1025
45 BOX wagons loaded
744
1027
1341
1521
WDM2 be used in double headed or MU consist.

EBD of Freight stock hauled by single WDG2 locomotive:-

No. of Wagons
EBD in meters at varying speed KMPH
 50
 60
 70
 75
58 BOXN wagons loaded
 469
668
 896
 1025
45 BOX wagons loaded
 743
1012
 1337
 1501
WDG2 be used in double headed or MU consist.
This value is based on certain theoretical assumptions; hence these may be taken as guidelines only.


C & W - SILENT FEATURE OF BRAKE POWER CERTIFICATE (BPC)

BRAKE POWER CERTFICATE:-
  BPC is issued after intensive examination of train in empty   condition.
·         No sick wagon is allowed to run.
·         Prepare in triplicate.
·         Indicates brake power percentage of the train.
·         BPC will be invalid if,
(a)  The destination of the train is not mentioned on BPC.
(b)  The train composition of train is changed by 10 four wheeler unit or more.
(c)  The train is stable more than 24 hours at train examination points.

C & W - SILENT FEATURE OF BRAKE POWER CERTIFICATE (BPC)

BRAKE POWER CERTFICATE:-
  BPC is issued after intensive examination of train in empty   condition.
·         No sick wagon is allowed to run.
·         Prepare in triplicate.
·         Indicates brake power percentage of the train.
·         BPC will be invalid if,
(a)  The destination of the train is not mentioned on BPC.
(b)  The train composition of train is changed by 10 four wheeler unit or more.
(c)  The train is stable more than 24 hours at train examination points.
(d)  The integrity is changed of CC rake more than four, 8 wheeled wagon.

Type of Train
Color
Brake Power Percentage
Validity
Originating Station
Intermediate
Station
1.        Ordinary   Stock
(a)  Plain Bearing stock

(b)  Vacuum Brake Stock
UIC Stock/ CRC




(c)  Air Brake Stock


Pink



Pink






Green


85%



85%






 90%


75%



75%






75%


800 Kms.



End-To-End /Destination (Unloading) Station
(i)          4 Days in empty condition to reach loading station

End-To-End/ Destination (Unloading) station
2. Close Circuit (C.C.) Rakes
Blue
100%
75%
7500 kms / 35 days. In case the km. entries are incomplete
3.Premium rake
X
95%
75%
12 days in empty condition& 3 days grace period in loaded condition
4. Coaching Stock
    x
100%
90%
3500 Kms / 4 days Round pattern BPC


AIR PRESSURE CONTINUITY TEST:-
OBJECTIVE:-

      1-Continuity of brake pipe pressure from engine to brake van/ last vehicle.
2-On reduction of brake pipe pressure by driver, train brake must apply.
3-In emergency condition, if guard destroys BP pressure, then also train brake should be applied.

WHERE TO PERFORM:-
1-    When an engine is attached ahead or behind the train engine.
2-    When an engine is attached behind the last vehicle of the train.
3-    When traction or engine is changed.
4-    When shunting is performed in a train.
5-    Whenever air pressure leakage/brake power work is attended on a train.
6-    When a stable load has to be cleared from a road side station.

PROCEDURE:-
1. Charge the train with air pressure and ensure the requisite amount
                In Engine                         In Brake Van
          BP- 5.0                                   4.8 Kg/cm211- Maintenance is less.
          FP- 6.0                                    5.8 Kg/cm2
2. Guard will destroy the BP pressure by 1 Kg/cm2 with the help emergency handle of brake van or angle cock of last vehicle.
3. Driver will ensure that BP pressure drops in engine also. He will observe Air flow indicator, light and buzzer.
4. Guard will place the emergency handle in normal position and will allow   the BP pressure to charge again.
5. Driver and Guard will ensure that requisite amount of BP pressure            is charged again in engine as well as in brake van.
6. Driver will destroy the BP pressure to zero with the help of driver’s brake valve.
7. Guard will ensure the Bp pressure in brake van /last vehicle has also   dropped to zero.
8. To ensure brake application on train, Assistant Driver and Guard will check 3 or 4 wagons/ vehicles from their respective ends.
9. Driver will charge again Bp pressure by keeping the Driver’s brake valve in release position.
10. Driver and Guard will ensure that BP pressure both in engine and brake van / last vehicle is charged again to prescribed amount slowly and at Uniform rate.

.

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

A Center Of Information & News For Railway Employee By Information Center

Followers