Knowledge Hub Search – Search All Our Sites

Employee Information Smart Search


Sort :
Loading...
Go to Page :
Showing posts with label G D R ( GUARD DRIVER REPORT ). Show all posts
Showing posts with label G D R ( GUARD DRIVER REPORT ). Show all posts

10/03/2024

C & W - G D R ( GUARD DRIVER REPORT )

G D R ( GUARD DRIVER REPORT )

A)   G D R CHECK LIST:


1. Rake integrity is not disturbed by more than 10 FWUs or Four 8- Wheeled wagons. Only intensively examined wagons duly certified by train examining staff are attached.
2. All CBCs and air hoses are properly coupled and locked.
3. All the angle cocks are in open condition.
4. The rearmost angle cock of LV is in closed position.
5. Empty load handle is properly placed as per the empty or loaded condition of the wagons.
6. There is no loose fittings/hanging parts like push rod, pull rod, brake beam, safety brackets, brake blocks, CBC operating, handle etc., which may endanger the safe running of train.
7. Hand brake of all the wagons is in released condition i.e., in OFF position.
8. Doors of wagons are closed and locked/secured.
9. Correct position of Twist lock.

.

Disclaimer: The Information/News/Video provided in this Platform has been collected from different sources. We Believe that “Knowledge Is Power” and our aim is to create general awareness among people and make them powerful through easily accessible Information. NOTE: We do not take any responsibility of authenticity of Information/News/Videos.

A Center Of Information & News For Railway Employee By Information Center

Followers