1. Introduction of Carriage & Wagon
1.1 Role of C&W in Railways
A. Related with Open Line working:-
- To ensure and co-operate in safer running of rolling stock.
- To attend required schedule maintenance & running repairs of rolling Stock till the stock are again due for P.O.H.
- To assist in time running of trains to maintain the punctuality.
B. Related with Work -Shop working:-
- To attend Periodical Overhauling of Rolling Stocks.
- To adopt required modifications.
- To maintain proper records of all the rolling stock running in Indian Railways.